| A ramp was added to the front of KH which will also serve as the stage for the AH |
| Stairs were added to the Baptismal pool |
| These are the benches for seating being made |
| At the same time Roof rafters were being installed |
![]() |
| First attempt at making the pillars the benches will sit on |
![]() |
| Wash sinks are added to the bathrooms |
![]() |
| Work on the stage progresses |
![]() |
| Pads were poured around each pillar |
![]() |
| First section of the slab poured |