Thursday, September 20, 2012

Work In Progress

A ramp was added to the front of KH which will also serve as the stage for the AH

Stairs were added to the Baptismal pool

These are the benches for seating being made


At the same time Roof rafters were being installed


First attempt at making the pillars the benches will sit on


Wash sinks are added to the bathrooms

Work on the stage progresses


Pads were poured around each pillar


First section of the slab poured